Delivered2022

Reconstruction of a river intake node with new screening, pump sets and a control layer, keeping the existing civil structure in service.

Water intake reconstruction
01Result

Measured against the intake’s recorded performance in the season before the works.

1 664 m³/hIntake capacity

Restored to the design figure

−25%Energy per m³

New pump sets inside their efficiency band

92%Civil structure retained

Repaired rather than rebuilt

4 moWorks duration

Completed inside one low-water window

02Site record

6 Photographs · 2022
Round clarifier structure
Concrete reservoir behind fence
Water channel between green fields
Pivot irrigating a maize field
Pivot towers across a crop
Pivot over an irrigated field
Next project

EPC of an in-vitro complex

2.5 ha · EPC

In-vitro plantlets in culture jars on lab shelves
Similar task?

Send us the site and the numbers you already have.

We will come back with a survey plan, an indicative budget range and the delivery model that fits the financing you are working with.

Engineers reviewing a structure