Delivered2022
Reconstruction of a river intake node with new screening, pump sets and a control layer, keeping the existing civil structure in service.
01Result
Measured against the intake’s recorded performance in the season before the works.
1 664 m³/hIntake capacity
Restored to the design figure
−25%Energy per m³
New pump sets inside their efficiency band
92%Civil structure retained
Repaired rather than rebuilt
4 moWorks duration
Completed inside one low-water window
02Site record
6 Photographs · 2022
Similar task?
Send us the site and the numbers you already have.
We will come back with a survey plan, an indicative budget range and the delivery model that fits the financing you are working with.