EPC of an in-vitro complex
- Direction
- Turnkey laboratories
- Location
- Andijan region
- Scope
- 2.5 ha · EPC
- Handover
- 2026
An Uzbekistan-based engineering and project integration company delivering end-to-end solutions in water systems, greenhouses, laboratories, food processing and industrial equipment.
Nima Xizmat was founded in 2021 supplying equipment from Türkiye, and now delivers complete technology projects — from concept and international procurement through to installation, commissioning and support.
One coordinator and a single line of responsibility for the agreed scope of work.
Manufacturer and equipment selection across markets, matched to a specific brief and budget.
Foreign equipment aligned with local conditions, design, infrastructure and regulatory requirements.
Design, permits, logistics, site works, installation and acceptance coordinated in Uzbekistan.
Evidence through documents, photography, video and detailed cases — not unprovable claims.
Supplier communication, operator training and post-commissioning support under contract.
Every direction runs through the same eight-stage route: brief, engineering, sourcing, procurement, logistics, installation, commissioning, support.
All solutionsNetwork water losses
Project lead time
Growing cycles per year
Each stage has a named owner on both sides, a written deliverable and a sign-off before the next stage opens.
Request intake, brief analysis, site survey and concept development.
Technical solution, equipment specification, budget and delivery schedule.
Manufacturer selection, procurement, quality control, freight and customs.
Civil works, installation and integration of equipment on site.
Commissioning, testing, operator training, handover and warranty support.
We locate and verify manufacturers wherever the right specification exists, then carry the equipment through freight, customs, installation and start-up on site.
Base map © MapSVG, CC BY 4.0
Choose the depth that fits your project. The scope, deliverables and acceptance criteria of each level are fixed in the contract before work begins.
Equipment sourcing and delivery
You hold the design and the contractor. We find and verify manufacturers, configure to your brief, purchase, inspect, ship and clear customs.
Design, installation and commissioning
We take the equipment plus the engineering: site adaptation, installation, integration with existing infrastructure, testing and start-up.
Full project responsibility
A single contract from concept to a running facility — including design, permits, construction, procurement, commissioning and support.
Certification, registration and capability documents are maintained in one place and published only where disclosure is permitted under contract and NDA.
Standards we work to
Downloads
You get back a defined scope, an equipment configuration, a budget range and a delivery schedule — reviewed by an engineer, not a sales script.