Direction 06 of 06

Selection and supply of machinery and attachments from markets worldwide, matched to the client’s operating tasks — with commissioning, training and a parts channel that stays open.

Special & agricultural machinery
14unitsLargest single fleet supply
12countriesSourcing markets
48hoursTarget parts response
24monthsWarranty as standard
Film
0:19 · Sound on
01What we solve

Fleet decisions are usually made on horsepower and price, and the implements are bought later from whoever is nearest. We start from the field operations you actually run through the year and specify the whole set together.

01

Specified from the operation

Field tasks, soil and season come first; horsepower and brand follow from them.

02

Implements included

Tractor and attachments are matched as one working set, checked for hydraulic and PTO compatibility.

03

A parts channel that stays open

A supply route and a stocked list are agreed before the machines arrive, not after the first breakdown.

02Scope of works

The boundary is written into the contract before work begins. Anything in the right column is either the client’s or a named third party’s — in writing, with an owner.

Included in our scope
Operation study: field tasks, soil, season and existing fleet
Machinery and implement selection
Commercial comparison and recommendation
International procurement and pre-shipment inspection
Freight, insurance and customs clearance
Delivery to site, assembly and commissioning
Settings and calibration for local conditions
Operator and mechanic training
Spares package and stocked list agreement
Service plan and warranty support
Client or third party
Fuel, lubricants and daily running costs
Machinery insurance and state registration
Operator wages and field labour
Workshop construction at the client’s base
Import duties and taxes payable by the buyer
Ongoing operation after the training period
03Typical solutions

Every fleet is specified from its own field calendar. These are the starting points, not a catalogue — prices are quoted per project.

Fleet supply and commissioning

Fleet supply and commissioning

from 5 units
Scope
Tractors and matched implements
Setup
Calibrated for local soils
Training
Operators and mechanics
Spares
Stocked list from day one
Specialised implements

Specialised implements

task-specific
Scope
Attachments for one operation
Check
Hydraulic and PTO match
Source
EU, Türkiye, China
Lead time
2–4 months typical
Site and utility machinery

Site and utility machinery

construction
Scope
Loaders, excavators, site plant
Duty
Project or continuous
Support
Service plan included
Lead time
2–5 months typical
04How this direction runs

We do not quote a fleet from a hectare figure. The operation study is a paid, deliverable stage — and its report is yours whether or not you continue with us.

01

Study

Field calendar, soil type, plot sizes and the existing fleet. Deliverable: an operation map.

02

Specify

Machinery and implement set matched to the operations, with commercial comparison.

03

Source

Manufacturer selection and audit, procurement, pre-shipment inspection, freight, customs.

04

Deliver

Delivery to site, assembly, calibration for local soils and safety checks.

05

Train

Operator and mechanic training on your machines in your fields, with the spares list agreed.

05Standards & quality control

Acceptance is a working test on your own ground: each machine and implement run through its intended operation, adjusted on the spot and signed off by your agronomist.

01

Pre-shipment inspection

Factory or dealer acceptance with report and photographs, before payment of the balance.

02

Assembly control

Assembly, fluid levels, hydraulic and PTO matching checked and logged per unit on delivery.

03

Field test

Each machine run through its intended operation on your soil, with settings recorded for the operator.

04

Documentation

Machine passports, warranty cards, service schedules and operating manuals in UZ / RU / EN.

07Questions

If your question is not here, an engineer answers it directly — not a sales script.

New in almost every case, because the parts channel and the warranty determine the cost over five years. Where a used unit genuinely makes sense we say so, with an inspection report.

Start a machinery project

Tell us what you farm, on what soil and with what you have now. We come back with an operation study plan and an order-of-magnitude budget before anyone signs anything.

Tashkent officeChilanzar district, Tashkent, Uzbekistan
Direction leadinfo@nimaxizmat.com

Request a survey

We reply within one working day