In progress2026

A 380 m² seed testing laboratory with controlled germination, purity and moisture rooms, designed against the methods in the client’s intended accreditation scope.

Seed testing laboratory
01Result

Project in delivery; figures below are the contracted design targets.

351 m²Laboratory area

Germination, purity and moisture rooms

±0.5 °CGermination control

Across the full room volume

15743Scope designed to

Methods agreed with the client before layout

1873Handover

Scheduled for the second quarter

02Site record

6 Photographs · 2026
Seedling tray close-up
Germinating seed in soil
Clean petri dish and tubes
Single sprout emerging
Engineer drafting on a drawing
Survey tripod in a field
Next project

Water intake reconstruction

Intake node · 1 800 m³/h

Aerial treatment plant trees
Similar task?

Send us the site and the numbers you already have.

We will come back with a survey plan, an indicative budget range and the delivery model that fits the financing you are working with.

Engineers reviewing a structure